
Suggested searches
Plant-based protein powders
Vegan leather handbags
Bedroom decor
Waterproof jackets
Hoodies


Quantity
1
Description
4.9
47 ratings
5
4
3
2
1
The deck was restore to true level.
The project was to correct for the installer's misplacement of the Hot Tub. It was installed between the (4) 14" LVLs that supported the floor joists. Over the past 4 years the deck sagged 3/4" . To engineer the correction, two concrete footers, plus two Ellis STL-22s with the U tops and 2 2x12 PT were used. Besides setting the footers, the the full repair took about 1 hours as the Ellis Light Duty Steel Shores made it very simple and quick to install. The deck was restore to true level.
John · September 3, 2024
Great Shore
I should have purchased my STL-22 years ago. Beats the heck out of using hydraulic bottle jacks and building and removing temporary supports. I cannot explain why the people I used to work for did not have an assortment of these shores.
Douglas · July 13, 2024
Arrive without a screw .
Eduardo · September 1, 2024
Returns accepted within 30 days







