
Suggested searches
Plant-based protein powders
Vegan leather handbags
Bedroom decor
Waterproof jackets
Hoodies


Description
5.0
1 rating
5
4
3
2
1
I installed 135’ assembly of the flojac system. Everything went together as planned with the instructions. We waited 24 hrs for the joints to set up , then the installation went just fine using a gooseneck spool on a boom pole . Everything went together very well. After landing the system at depth , we started pumping, and within about 5 minutes , I had good cllear water at surface. I am very pleased with the system so far . The freeze port also drained well to prevent winter freeze problems !
Michael · July 19, 2026




